At a glance

What belongs in an IT contingency plan?

An IT contingency plan sets out which work must resume first, what data and applications it needs, who makes decisions and which alternative is ready. The plan must remain accessible when your usual sign-in stops working.

Is a backup enough?

A backup helps restore data. Resuming work also requires the right applications, working sign-in and clearly assigned responsibilities.

How can you test the plan?

Walk through an important task with your usual cloud access unavailable. The exercise reveals gaps; it does not replace a technical recovery test.

Go to the 30-minute exercise

An order needs to go out today. But the file will not open, sign-in is stuck and the colleague who must approve it can only be reached through the company chat, which is also down. Knowing that the data still exists is only part of the answer. Someone needs to be able to work with it.

The latest report about further expected IT outages in the United States therefore also matters to businesses in Germany. It provides a reason to review contingency plans. It does not predict which service will fail here next.

Why does the US government expect further IT outages?

On 23 November 2026, Heise reported on a CNN interview with US Director of National Intelligence Jay Clayton from the previous day. Clayton expects further interruptions while ageing digital systems are upgraded. He cited performance requirements and cybersecurity as reasons for modernisation.

The report follows disruptions affecting Microsoft, US air traffic control and banks, among others. The explanation that rapid security patching contributed to outages comes from the US government. It does not replace a technical investigation of each incident. It establishes neither a coordinated attack nor a general claim that AI caused the disruptions.

For IT teams, this raises a familiar trade-off: a security vulnerability calls for a rapid response, while an update can also disrupt operations. NIST therefore includes testing, prioritisation and prepared recovery procedures in patch planning. Simply suspending security updates would be the wrong conclusion.

What should an IT contingency plan contain?

Start with an important business process rather than an inventory of every server. Processing a customer order is one example. The plan needs to explain who takes responsibility during a disruption, what information is required and how work can continue temporarily.

QuestionWhat the plan should record
What takes priority?A specific process and its longest tolerable interruption.
What does it require?Files, applications, sign-in, approvals and the people involved.
How can work continue temporarily?A prepared alternative, the data it provides and its limitations.
Who decides and communicates?The responsible person, a deputy and a contact method outside the affected system.

Two time objectives make the plan testable. The recovery time objective, or RTO, in the BSI standard sets the target time from the declaration of an emergency to recovery. Detection and decision time must also be included when considering the overall interruption. Together, these must remain within the maximum tolerable period of disruption. The recovery point objective, or RPO, defines how far back the restored data may date.

Cloud outage: does your alternative depend on the same sign-in?

A second application offers little help if it needs the same unavailable sign-in service. An emergency handbook in the company wiki is also inaccessible when access to that wiki fails. Check shared dependencies as well as individual services: authentication, internet connectivity, devices and the required data.

For emergency contacts and initial response steps, a current paper copy or an approved, encrypted local copy can be useful. Access permissions and secure storage matter too. The plan should neither exist solely inside the affected system nor be left freely accessible. Passwords do not belong in a generally accessible contact list.

The same applies to files prepared for temporary work. A file visible online is not necessarily available offline. A local copy may be out of date. Decide which information may be used during disruption and how subsequent changes will return to the normal workflow in an orderly way.

Why a backup alone does not keep operations running

A backup is intended to make data recoverable. Business continuity goes further: it organises how essential work continues during a disruption. Even when a backup can be restored, the necessary application, a working sign-in or the responsible person's approval may still be missing.

Synchronisation and backup serve different purposes too. Synchronisation aligns file versions and can also propagate unwanted changes. Data protection requires suitable earlier versions and a tested recovery procedure. Check separately whether data can be restored and whether the affected business process actually works with it.

A 30-minute tabletop check for your IT contingency plan

Set aside half an hour with the person responsible for the business process and your IT team. Walk through a hypothetical outage. Do not switch off production services for this exercise. The aim is to find gaps before a real incident exposes them.

  1. Choose a process that needs to be completed today. Record how long it can be interrupted at most.

  2. Assume your usual cloud access is unavailable. Ask the responsible person to show where they would find emergency contacts and initial response steps without using that access.

  3. Walk through the alternative using a non-sensitive test file. Which application opens it, how current is it, who may edit it and how does the decision reach the next person?

  4. Check shared authentication and the communication route. If the alternative fails for the same reason, the dependency remains unresolved.

  5. Record each gap with an owner and an appropriate follow-up date. Schedule a separate, controlled recovery test if its outcome is still unknown.

The result is a traceable procedure and a list of unresolved issues. This tabletop check proves neither complete resilience nor an achieved recovery time. The latter must be measured in a planned technical test.

What should you ask your cloud provider?

Ask which functions a disruption could affect, where status updates appear and how to reach support if normal sign-in is unavailable. Clarify who restores data, which time commitments apply and what preparation remains your responsibility.

At luckycloud, we believe the same standard should guide the selection and setup of our own services: a cloud offering needs to fit the processes you want to keep running. A data centre's location alone does not establish whether an emergency workflow will work. Our article on digital sovereignty and open source explores which dependencies businesses can deliberately shape.

Take one practical task from the news: ask someone to demonstrate how your most important process would continue without its usual access route. Whatever is missing belongs next in your IT contingency plan.

Sources and date

Updated: 23 November 2026. The news section refers to the publications below. The tabletop check is our editorial suggestion for preparation, not a report of a completed customer test.

You might also be interested in